P.S. 119 Bronx TCU Removal & Playground Redevelopment

1075 Pugsley Avenue, Bronx, NY 10475
New York City School Construction Authority (NYCSCA)
2.5m

Project Overview

The P.S. 119 Bronx project involved the removal of temporary classroom units (TCUs) and full redevelopment of the school playground and exterior recreational areas. The work included demolition, new grading and drainage infrastructure, playground construction, safety surfacing, fencing, landscaping, and accessibility upgrades. Construction was performed within an active school environment requiring phased scheduling, strict safety coordination, and integration with existing site utilities and adjacent DPR park areas.

Landscape Architect / Designer: Semmens Associates, P.C.
MEP Engineer: Shenoy Engineering, P.C.

Key Challenges

  • Removal of existing TCU structures and associated plumbing, electrical, and site utilities while maintaining safe school operations.
  • Construction within a tight urban footprint adjacent to Blackrock Playground and public right-of-way areas.
  • Installation of new storm drainage systems, channel drains, and site plumbing coordinated with erosion control and tree protection measures.
  • Integration of playground equipment, basketball courts, seating areas, and ADA-compliant ramps into existing site conditions.

Detailed Scope of Work

  • Demolition and removal of temporary classroom units, pavements, utilities, and site elements to prepare for new construction.
  • Installation of new concrete pavements, asphalt play areas, safety surfacing, and sports courts including basketball areas.
  • Construction of playground features, seating areas, decorative fencing, gates, and site furnishings.
  • Site grading, drainage improvements, storm piping, channel drains, and erosion control systems.
  • Landscaping work including tree protection, planting areas, soil stabilization, and restoration of adjacent green space.
  • Coordination of mechanical, electrical, and plumbing work supporting new exterior infrastructure.
  • Final site restoration, inspections, closeout documentation, and project turnover in accordance with NYCSCA standards.

P.S. 119 Bronx TCU Removal & Playground Redevelopment: Completed Project