North Shore Marine Transfer Station Floor Rehabilitation

120 31st Ave, Flushing, NY 11354
New York City Department of Sanitation (DSNY)
5m

Project Overview

The North Shore Marine Project involved accelerated structural and facility upgrades at an active marine transfer station, completed within a demanding 30-day construction schedule. The project required precise coordination, rapid mobilization, and strict safety controls to deliver heavy civil, structural steel, concrete, and mechanical improvements while maintaining operational efficiency.

Engineer/Designer: HDR Engineering, Inc.

Project Highlights & Key Challenges

  • Accelerated 30-day fast-track schedule, requiring extended work hours, tight sequencing, and coordinated trade activities.
  • Work performed within an active sanitation facility, requiring phased construction and detailed logistics planning.
  • Structural demolition and reconstruction in high-load operational areas while maintaining strict safety standards.
  • Coordination between structural, mechanical, HVAC, and welding trades to meet aggressive deadlines.

Scope of Work

  • Mobilized personnel, equipment, and materials; implemented comprehensive safety, environmental, and quality control measures.
  • Demolished existing structures, pavements, steel components, and equipment; removed and legally disposed of debris.
  • Performed earthwork, grading, and erosion control to achieve required elevations and drainage performance.
  • Installed reinforced concrete pavements, slabs, and flatwork with proper subgrade preparation, reinforcement, finishing, and curing.
  • Fabricated and installed structural and miscellaneous steel including beams, columns, frames, platforms, railings, and anchorage systems.
  • Completed certified welding operations with inspection, testing, and finishing to meet project standards.
  • Furnished and installed HVAC systems including equipment, ductwork, supports, insulation, and accessories, coordinated with electrical and control systems.
  • Conducted inspections, testing, and commissioning of concrete, steel, welds, and HVAC systems to ensure compliance and performance.
  • Performed final site cleanup, removal of temporary facilities, restoration of disturbed areas, and submission of as-built drawings, warranties, and closeout documentation.
  • Completed final inspection and successful turnover of the project to DSNY.