P.S. 163 Manhattan Playground & Site Improvements

163 W 97th St, New York, NY 10025
New York City School Construction Authority (NYCSCA)
2.6m

Project Overview

The P.S. 163 project involved comprehensive exterior playground and site improvements focused on upgrading accessibility, drainage, and long-term durability of the schoolโ€™s outdoor spaces. Construction was performed within an active school environment, requiring strict safety coordination, phased work zones, and detailed trade management to minimize disruption to daily operations.

Designer/Engineer: NYCSCA Design Team

Project Scope

  • Provided all labor, materials, equipment, supervision, permits, inspections, and coordination required for the project in accordance with NYC SCA standards, approved drawings, and applicable codes.
  • Performed site preparation including layout, protection of existing conditions, demolition, excavation, grading, erosion control, and debris removal.
  • Furnished and installed concrete pavement, ADA-compliant ramps, colored concrete, and exterior flatwork improvements.
  • Furnished and installed exterior benches, fencing systems, gates, foundations, and related hardware throughout the site.
  • Performed landscaping work including soil preparation, planting, sod installation, irrigation (as required), and maintenance until acceptance.
  • Furnished and installed HVAC, plumbing, and electrical systems including equipment, piping, ductwork, wiring, controls, testing, and commissioning.
  • Maintained site safety, coordinated all trades, protected existing facilities, supported school operations, completed inspections, provided closeout documentation and warranties, and achieved final acceptance.