P.S. 32 Queens TCU Removal & Egress Modification

171-11 35th Ave, Flushing, NY 11358
New York City School Construction Authority (NYCSCA)
1.8m

Project Overview

The P.S. 32 Queens Early Package project included removal of temporary classroom units (TCUs) and associated infrastructure to prepare for a new school addition. Work involved structural demolition, utility removals, egress modifications, and selective building upgrades while maintaining safe operations within an active school environment. The project required detailed coordination of site logistics, phased construction, and protection of existing utilities and adjacent structures.

Architect / Engineer: Velocity Architecture & Engineering / Langan Engineering

Key Challenges

  • Removal of TCUs, ramps, stairs, railings, and foundation footings within an occupied school site requiring strict safety coordination.
  • Integration of temporary and permanent egress modifications to maintain code-compliant access during construction.
  • Coordination with existing utilities including telecom, fire alarm, electrical, and water services during removal and capping operations.
  • Protection of existing fencing, drainage infrastructure, and trees while performing demolition and site work.

Detailed Scope of Work

  • Demolition and removal of temporary classroom units including stairs, ramps, railings, structural foundations, and associated site elements.
  • Removal of existing asphalt pavement, fencing systems, gates, transformer vaults, and site utilities within project limits.
  • Selective removal and capping of water, sanitary, telecom, fire alarm, and electrical services in coordination with agency requirements.
  • Structural egress modifications including temporary exit pathways, entrance improvements, and code-compliant accessibility upgrades.
  • Interior selective demolition, partition modifications, and plumbing upgrades supporting new layouts.
  • Installation of erosion control, inlet protection, and tree protection measures during construction activities.
  • Site grading adjustments and asphalt pavement restoration following demolition activities.
  • Coordination of architectural, structural, mechanical, plumbing, and electrical work to support early construction phases of the school addition.
  • Final cleanup, inspections, closeout documentation, and project turnover completed in accordance with NYCSCA standards.