P.S. 25R Staten Island TCU Removal & Playground Update

4210 Arthur Kill Rd, Staten Island, NY 10309
New York City School Construction Authority (NYCSCA)
2m

Project Overview

The R025 SPED Staten Island project involved removal of temporary classroom units (TCUs) and full playground and athletic area upgrades at P.S. 25R. The scope included demolition, grading, stormwater drainage improvements, sports court reconstruction, fencing systems, and accessibility upgrades. Work was completed within an active school environment requiring strict safety coordination and phased construction.

Landscape Architect / Designer: Design, NY โ€“ Landscape Architecture & Site Planning
MEP Engineer: Lilker Associates โ€“ Mechanical & Electrical Engineers

Key Challenges

  • Construction within an occupied NYC school facility requiring controlled access and coordination with ongoing school operations.
  • Removal of TCUs and associated utilities while protecting existing building systems and surrounding site conditions.
  • Integration of new drainage systems, ADA-safe grates, and site grading within existing infrastructure.
  • Installation of sports courts, fencing systems, and exterior paving within a limited site footprint.

Detailed Scope of Work

  • Demolition and removal of existing temporary classroom units, fencing, pavements, and site elements.
  • Installation of new concrete pavements, asphalt play areas, and athletic surfaces including basketball courts and running track improvements.
  • Site grading and drainage upgrades including trench drains, storm piping, and cesspool frame replacements.
  • Construction of new chain-link fencing systems, gates, and hardware assemblies surrounding play areas.
  • Landscaping and erosion control including soil stabilization, tree protection, and permanent seeding.
  • Installation of sports equipment including basketball posts, backstops, and court striping layouts.
  • Coordination of mechanical, electrical, and site utility improvements supporting new exterior infrastructure.
  • Final site restoration, inspections, closeout documentation, and project turnover in accordance with NYCSCA standards.

P.S. 25R Staten Island TCU Removal & Playground Update: Completed Project

P.S. 25R Staten Island TCU Removal & Playground Update: During Construction