Mon – Fri: 8am – 4pm
The Chempack Room Redesign project at Metropolitan Hospital involved interior structural, architectural, mechanical, and electrical upgrades supporting emergency preparedness infrastructure as part of a FEMA flood resiliency initiative. Working as a subcontractor under Gilbane Building Company, our team performed specialized construction within an active hospital environment requiring strict safety coordination, phased sequencing, and integration with ongoing facility operations.
General Contractor: Gilbane Building Company
Engineer / Designer: Stantec Consulting Services, Inc. / JFK&M Engineers LLP
Role: Subcontractor