Project Overview

The 16th Street Park Improvements project involved full reconstruction and modernization of an existing urban recreation space, including new athletic courts, playground features, sprayground equipment, landscaping, and ADA-compliant access improvements. Work included demolition, new paving systems, lighting upgrades, fencing installation, and drainage infrastructure improvements to create a durable and accessible community park environment.

Architect / Designer: Bohler Engineering NJ, LLC

Key Challenges

  • Construction within a dense residential neighborhood requiring phased work sequencing and controlled access.
  • Integration of multiple recreational elements including basketball courts, pickleball courts, sprayground systems, and playground areas within a compact footprint.
  • Coordination of underground utilities, decorative lighting, and drainage infrastructure with existing municipal services.
  • Maintaining ADA-compliant access routes and safety surfacing across varied elevations and play areas.

Detailed Scope of Work

  • Demolition and removal of existing asphalt pavement, concrete sidewalks, fencing, gates, utility poles, and site furnishings.
  • Installation of new concrete sidewalks, curbs, colored concrete paving, acrylic sport surfaces, and asphalt pavement restoration.
  • Construction of basketball courts, pickleball courts, synthetic lawn areas, and rubber safety surfacing systems.
  • Installation of playground equipment, sprayground water features, benches, picnic tables, trash receptacles, and site furnishings.
  • Installation of decorative area lighting, electrical infrastructure, and coordination with utility providers.
  • Landscaping improvements including tree pits, planting areas, soil preparation, and site restoration.
  • Installation of new fencing systems, gates, and tree pit guards surrounding recreation areas.
  • Final site grading, striping, ADA improvements, inspections, closeout documentation, and project turnover in accordance with municipal standards.

16th Street Park Improvements: Completed Project